
WIKA operating instructions models TR10-L, TC10-L (Ex d)
3370964.05 04/2014 GB/D/F/E
17
GB
■
No capacitor may be tted within the ameproof enclosure that has a residual energy of
≥ 0.02 mJ at the end of the time required to open the housing. The housing must not be
opened during operation. After the power supply has been switched o, a waiting time of
2 minutes must be observed before the housing is opened.
■
Mounting within metallic enclosures:
The housing must be grounded against electromagnetic elds and electrostatic
discharge. It does not have to be connected separately to the equipotential bonding
system. It is sucient if the metallic thermowell has a solid and secured contact with the
metallic vessel or its structural components or pipelines, so long as these components are
connected to the equipotential bonding system.
■
Mounting within non-metallic enclosures:
All electrically-conductive thermometer components within the hazardous area must be
provided with equipotential bonding.
■
Neither repairs nor structural modications are permitted, and any would void the
guarantee and the respective certication.
■
The manufacturer shall not be responsible for constructional modications after delivery
of the instruments.
8. Safety-related instructions
Marking
Design Flame path
tting
ATEX
Gas Dust
Solid-machined thermowell
(minimum wall thickness 1 mm)
No
II 2G Ex d IIC T4/T5/T6
II 2D Ex tD A21 IP66 T85 °C
Solid-machined thermowell
(minimum wall thickness 1 mm)
Yes
II 2G Ex d IIC T4/T5/T6
II 2D Ex tD A21 IP66 T85 °C
Fabricated thermowell
(minimum wall thickness 1 mm)
Yes II 2G Ex d IIB + H
2
T4/T5/T6 II 2D Ex tD A21 IP66 T85 °C
Without thermowell Yes II 2G Ex d IIB + H
2
T4/T5/T6 -
Performance information
■
with terminal block: U
m
= DC 2 V I
m
= 5 mA
■
with transmitter: U
m
= DC 30 V P
m
= 2 W
7. Information on mounting ... / 8. Safety-related instructions
Komentarze do niniejszej Instrukcji